Your first shift in Zap
First shift running Zap? This walkthrough covers the full flow of a heat — from charging the furnace until the lot is released for shipment. Each step links to the detailed guide and to the app screen.
The flow of a shift
Section titled “The flow of a shift”-
Confirm your charge order. The shift starts from the Charge Orders that planning scheduled. Each one gives the model charge (the recipe), the furnace, the furnace operator and the date. They are in Producción → Recetas y Órdenes → Órdenes de Carga (Production → Recipes and Orders → Charge Orders). → Detail: Alloys and model charges · Open: Production board →
-
Record the heat. Go to Producción → Coladas (Production → Heats) and press Nueva Colada (New heat). Zap proposes the next heat number (e.g.
12345). Fill in Cliente, Producto, Horno, Hornero (customer, product, furnace, furnace operator), the start and end times and the gas readings. → Detail: Record a heat -
Capture from the floor. In Operador → Captura Reporte (Operator → Report capture) you fill in the report from your phone: you pick the heat, record the materials, the gas meter reading and the kilos of PT ok, Subproducto and Reproceso (good finished product, by-product and rework). Then you write down the process readings and sign with Firmar y Enviar a Revisión (Sign and send for review).
-
Check the chemistry. The official chemical analysis lives in the lab’s portal, arl.bauxtp.com. Zap reads it to certify. If the heat is «en revisión en laboratorio» (under review in the lab), Zap does not certify it and shows you the reason the lab gave. The reading is only good if the sample disc was prepared well: the chemistry face always on the lathe, never with sandpaper, and without touching it. → Detail: Enter a chemical analysis · Review a heat in the ARL · Prepare the sample disc
-
Record furnace and inventory movements. What you charge and what comes out, for melt loss and costs. → Detail: Inventory movements · Open: Kardex Contable →
-
Pass quality. Porosity and inclusions against the standard. A heat held by an open porosity reaction plan cannot be shipped. → Detail: Porosity and inclusion control · Microscopy
-
Ship what is released. Shipping order → delivery note → labels. → Detail: Shipments and delivery notes · Open: Shipments board →